You are now on our {0} Station. You can also visit our {1} site www.pandawhole.com{3} for a better shopping exprerice.
If you want to know more discount products, please click here >>
Activity Price:
US $0.93 - US $1.36
MOQ: 50 Packages(=100 Pairs)
Pricing Calculation: US $49.00 - US $68.00
Get Coupon
Product value more than US $1,000.00
Valid until March 31,2023, PST.
Get
Coupon
As Low As: US $0.49 / Pair
Ready Time: 10-35 Days
13x2.5mm, 10 Gauge, Pin: 0.9mm 17x2.5mm, 10 Gauge, Pin: 0.9mm 19x2.5mm, 10 Gauge, Pin: 0.9mm 21x2.5mm, 10 Gauge, Pin: 0.9mm 23x2.5mm, 10 Gauge, Pin: 0.9mm 25x2.5mm, 10 Gauge, Pin: 0.9mm 15x2.5mm, 10 Gauge, Pin: 0.9mm
Package Size: 2 Pairs 2 Pairs 5 Pairs 12 Pairs 100 pcs 12 Pairs 10 Pairs
Slight deviations in colors is allowed due to different display device.
0W Golden
SKU: EJEW-G272-01-20mm-G
MOQ: 50 Packages (100 Pairs)
8% OFF
US $1.12
0X Stainless Steel Color
SKU: EJEW-G272-01-20mm-P
MOQ: 50 Packages (100 Pairs)
US $0.98
US $0.93
0Y Rose Gold
SKU: EJEW-G272-01-20mm-RG
MOQ: 50 Packages (100 Pairs)
10% OFF
US $1.36
0Z Electrophoresis Black
SKU: EJEW-G272-01-20mm-B
MOQ: 50 Packages (100 Pairs)
10% OFF
US $1.13
21 Multi-color
SKU: EJEW-G272-01-20mm-M
MOQ: 50 Packages (100 Pairs)
US $1.26
US $1.19
304 Stainless Steel Huggie Hoop Earrings, Ion Plating(IP), Ring
Electroplating process of our stainless steel jewelry is divided into three kinds, including vacuum ion plating(IP), vacuum plating and water electroplating. For the thickness of layer, it is influenced by the electroplating process and electroplating time, the longer the plating time, the thicker the plating layer is and the longer the color preserve. Below is a brief comparison of ion plating, vacuum plating and water galvanization color durability.
Electroplating Process | Feature | Metal Color | Color Durability |
---|---|---|---|
Vacuum Ion Plating(IP) | Vacuum plating process complex, environment and equipment requirements, for the green environmental protection technology. Electroplating in the vacuum oven, and color retention time longer. | Real Gold Plated (18K, 24K) |
Usually 1 Year |
Real Rose Gold Plated | Usually 6~12 Months | ||
Multi-Color | Usually 6~12 Months | ||
Blue | Usually 6~12 Months | ||
Vacuum Plating | Vacuum plating process complex, environment and equipment requirements, for the green environmental protection technology. Electroplating outside the vacuum oven. | Real Gold Plated (18K, 24K) |
Usually 1 Year |
Real Rose Gold Plated | Usually 6 Months | ||
Water Plating | "Water plating" liquid is processed in an aqueous solution. | Real Gold Plated (18K, 24K) |
Usually 6 Months |
Golden Plated | Usually 3~6 Months |